Monday 6 August 2012

[2 plantrooms] coming of the Final models

This is our final models for our 2 plantrooms which situate on top of our hotels. There has been alot of change from our initial models as we meet some new ideas that were met halfway and having to change materials/connection in order to create a scaled model of our plant rooms.

final model - bridge framing/tension 
There has been additional framings as we thought it would give emphasis to the broken/abandoned world

Very first drainage system model

Very first bridge framing/tension plantroom

BUILDING BLOCKS GET'S GO!

Figuring out the light and shadow with same lined template


Figuring out the light and shadow with criss cross line

our beginnings of the floating platforms


The making of final model - drainage system, how things will come together


bridge framings



atmospheric sectional expression

Experimenting with effects of colour

organising where what piece fits what

Painting the effects for our plant rooms

Multifunctional connections for our multifunctional plant rooms!

close ups of the connections between the 'floating' platforms and rusted/worn out/abandoned materials that pieced together this plant room


No comments:

Post a Comment